For the Homeowner

Phase 4 of 9

Electrical

Your responsibilities for the electrical phase — power, bonding, panels, and final checks before gunite.

Why this phase matters

Electrical is small but critical — the power feed, the panels, and especially the bonding system that keeps your pool safe. Confirm who's responsible for what, double-check every conduit and connection, and don't backfill until everything passes inspection.

Customize first. Some items only apply to certain projects (spa, fountains, art rock, etc.). Toggle the Project Options below before printing or sharing.

1
Plan Ahead

Before This Phase

2
Verify & Test

Day Of

Optional

Pro Tips

Optional

Notes

Electrical is in. Inspection ready.

Power is run, bonding is tied, every conduit is labeled. Schedule your pre-gunite inspection.